How do you run a team retrospective?
Set the stage, let everyone write down what they noticed, group the notes, discuss the few themes that matter most and leave with one to three actions, each with an owner and a date. The generator turns that into a timed agenda for 30, 45, 60 or 90 minutes, with board columns and prompts for the format you pick.
The blocks are proportional to the length, so they always add up: a 60-minute session gets 6 minutes to open, 15 to gather input, 9 to group and vote, 18 to discuss, 9 to decide actions and 3 to close.
Which retrospective format should you choose?
Pick the format by what the team needs to talk about. Rotating formats every few sessions also keeps the conversation from going stale.
| Format | Columns | Good for |
|---|---|---|
| Start / Stop / Continue | Start, Stop, Continue | New teams and short sessions |
| 4Ls | Liked, Learned, Lacked, Longed for | Bringing out what the team learned |
| Mad / Sad / Glad | Mad, Sad, Glad | After a hard or emotional stretch |
| Sailboat | Island, Wind, Anchors, Rocks | When a goal and its risks matter |
| Went well / Didn't / Try next | Three plain columns | Quick sessions that end in experiments |
The focus option adds three extra questions, for example about handovers for collaboration, or facts and times for a session after an incident.
How do you make it safe to be honest?
Say at the start that this is not a performance review: the team talks about the work and the process, not about people. Let everyone write silently before anyone speaks, so the loudest voice does not set the agenda. Agree that only the action list leaves the room.
With a large group, taking turns eats the clock. If you enter the number of people and there are fewer than two minutes per person in the gather block, the generator suggests silent writing followed by reading the notes aloud.
How many actions should come out of a retrospective?
One to three. A long list feels productive in the room and is forgotten by the next sprint. Each action should be a concrete step, owned by a named person or role, with a due date and a "done when" that tells the team whether it worked.
What do you get at the end?
A facilitator script to copy (ground rules, timed agenda, columns, focus questions and actions), a printable result, a CSV of the action list and an ICS file with all-day reminders on each due date. Print the result or paste the script into your meeting notes.
What should feed the next retrospective?
Bring a few shared facts so the discussion does not run on memory alone. The weekly productivity report template summarizes deliveries, volume and blockers; the workload balancing worksheet shows whether the plan fit the team's capacity. For a change you want to evaluate, compare comparable periods with team productivity before and after.
Monitoo Pulse adds team-level context, such as time in apps, websites and meetings, to discuss as a team rather than score anyone. Monitoo Pulse has a 7-day free trial, no credit card required.
Frequently asked questions
What is a team retrospective?
A short meeting at the end of a sprint, project or month where the team looks at how it worked, not just what it delivered, and agrees on one to three changes to try next.
Which retrospective format should I use?
Start/Stop/Continue is the simplest. 4Ls (Liked, Learned, Lacked, Longed for) brings out learning. Mad/Sad/Glad surfaces feelings after a hard stretch. Sailboat helps when a goal and its risks matter.
How long should a retrospective take?
About 30 minutes for a one- or two-week sprint with a small team, 60 to 90 minutes for a month, a project or a larger group. Longer is not better if no actions come out.
How do you make retrospective feedback safe to share?
State that it is not a performance review, talk about the work rather than people, let everyone write silently before speaking, and never quote individuals outside the room.