We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policies , Use Terms and cookies.

Hours Calculator

Paste one duration per line, straight from a spreadsheet or time card. Mix formats, subtract with a minus sign and get totals well above 24 hours.

Monitoo team · · 3 min read

Paste your durations

Runs in your browser: nothing you type is sent anywhere, and no sign-up is needed.

Formats: 8:30, 1:02:30, 8h 30m, 45 min, 2d 4h, 7.5 (decimal hours). Start with - to subtract.

The 30-second summary

  • Every value is turned into whole minutes before adding, so 8:30 + 7.5 + 45m adds up exactly: 16:45.
  • Totals do not roll over at 24 hours: a month of shifts shows as 176:30, not 8:30 on day 8.
  • A leading minus sign subtracts a value, or switch to "first minus the rest" to take time away from a starting balance.

Stop rebuilding timesheets by hand. Monitoo Ponto records punches from phone or browser and totals hours, overtime and balances for you. Start with a free account.

Create a free account
On this page
  1. How do you add hours and minutes?
  2. Which formats can you paste?
  3. How do you get a total above 24 hours?
  4. How do you subtract hours?
  5. What comes next after the total?

How do you add hours and minutes?

Turn everything into minutes, add, and turn the total back into hours and minutes. 7:45 is 465 minutes and 8:30 is 510; together they are 975 minutes, which is 16 hours 15 minutes. Adding the hours and minutes columns separately works too, as long as you carry every 60 minutes into an hour.

The calculator reads each line, converts it to whole minutes and adds. It never treats 75 minutes as "75" in the minutes column, which is the most common error in hand-made totals.

Which formats can you paste?

Paste one value per line, or separate values with semicolons or tabs, so a column copied from a spreadsheet works as is. Mixed formats are fine.

You typeRead asMinutes
8:308 hours 30 minutes510
1:02:301 hour 2 minutes 30 seconds, rounded63
8h 30m or 8 hrs 30 mins8 hours 30 minutes510
45 min45 minutes45
2d 4h2 days 4 hours3,120
7.57.5 decimal hours450
-0:45subtract 45 minutes−45

How do you get a total above 24 hours?

Keep the total as a duration, not a time of day. A clock rolls over at midnight; a duration does not. A month of 22 eight-hour shifts is 176:00, and the result shows it that way, along with the decimal (176.00) and the minutes (10,560).

Spreadsheets need help here. In Excel or Google Sheets, a sum of times formatted as h:mm wraps after 24 hours, so 176:00 shows as 8:00. Format the total cell as [h]:mm, or sum whole minutes and divide by 60, which is what the CSV export gives you.

How do you subtract hours?

There are two ways. Put a minus sign in front of any value to subtract it from the running total. Or pick First value minus the rest: the first line is your starting point and every other line is taken away, which is handy for "40:00 scheduled minus each absence". The table shows the running total after each line, so you can see where a negative result comes from.

What comes next after the total?

To convert the total for payroll, use the hours to decimal converter; it also shows the seconds lost when you round each line. To build the week from clock-in and clock-out times instead, use the time card calculator or the work hours calculator. For the time between two dates and times, see the time duration calculator.

When the list comes from a whole team every week, pasting stops scaling. With Monitoo Ponto, punches from the app or the browser add up on their own. Monitoo Ponto lets your team clock in from the mobile app or the browser, with a free account to start.

Frequently asked questions

How do I add hours and minutes?

Add the minutes and the hours separately, then carry every 60 minutes into an hour. 7:45 + 8:30 is 15 hours 75 minutes, which is 16:15. The calculator does it in minutes, so nothing is lost on the way.

How do I add more than 24 hours?

Keep the total as hours:minutes instead of a time of day. 22 shifts of 8:00 are 176:00. In Excel, the same total needs the [h]:mm cell format, or it shows 8:00.

How do I subtract hours?

Put a minus sign in front of the value, like -0:45, or choose "First value minus the rest" to start from a balance and take the other values away.

Is 7.30 the same as 7:30?

No. 7.30 is 7.3 decimal hours, which is 7 hours 18 minutes. 7:30 is 7 hours 30 minutes, which is 7.5 decimal hours. The calculator warns you when a value looks like it may have been typed the wrong way.

Sources

Spotted an error? Message our team on WhatsApp and we will fix it and date the correction.

Track your team's time without spreadsheets. Create a free Monitoo Ponto account and invite your team.

Create a free account

Related

Free tool

Hours to Decimal Converter

Two-way batch conversion between HH:MM and decimal hours, with exact minutes, chosen precision and rounding drift.

Free tool

Time Card Calculator

Weekly or biweekly time card with multiple unpaid breaks, overnight shifts, decimal hours and CSV export.

Free tool

Work Hours Calculator

Daily and weekly work hours with paid and unpaid breaks kept apart: paid hours, time on the clock and hands-on time.

WhatsApp Request free trial